Description
Environmental Quality - Sewage Industrial Effluent Regulations 2009 - THE 1979 REGULATIONS -
marceljude.ai
The 2009 Regulations are mainly these two separate instruments:
1. Environmental Quality (Sewage) Regulations 2009 — P.U. (A) 432/2009.
2. Environmental Quality (Industrial Effluent) Regulations 2009 — P.U. (A) 434/2009.
They replaced the old combined Environmental Quality (Sewage and Industrial Effluents) Regulations 1979 for ordinary current sewage and industrial-effluent control. The Department of Environment lists both 2009 instruments, and both were made under the Environmental Quality Act 1974, especially sections 21, 24, 25 and 51.
There is also a related 2009 regulation, Environmental Quality (Control of Pollution from Solid Waste Transfer Station and Landfill) Regulations 2009 — P.U. (A) 433/2009, but that one is about leachate and solid-waste transfer stations/landfills, not ordinary sewage or ordinary industrial effluent.
Below I type the two main 2009 Regulations here in a regulation-by-regulation way.
A. Environmental Quality (Sewage) Regulations 2009
P.U. (A) 432/2009
These Regulations govern sewage discharge onto or into soil, inland waters, or Malaysian waters. They apply except where the premises are a housing or commercial development, or both, with a population equivalent of less than 150.
Arrangement of Regulations
Regulation 1 — Citation.
Regulation 2 — Interpretation.
Regulation 3 — Application.
Regulation 4 — Notification for new source of sewage discharge or release.
Regulation 5 — Provision and proper operation of sewage treatment system.
Regulation 6 — Competent person.
Regulation 7 — Acceptable conditions of sewage discharge.
Regulation 8 — Licence to contravene acceptable conditions for sewage discharge.
Regulation 9 — Method of analysis and sampling of sewage.
Regulation 10 — Monitoring of sewage discharge.
Regulation 11 — Point of discharge of sewage.
Regulation 12 — Prohibition against sewage discharge through by-pass.
Regulation 13 — Spill or accidental discharge of sewage.
Regulation 14 — Prohibition against discharge of sludge into inland waters or Malaysian waters.
Regulation 15 — Restriction on disposal of sludge onto land.
Regulation 16 — Application for disposal of sludge onto land.
Regulation 17 — Reporting changes in information furnished for purpose of application of licence.
Regulation 18 — Display of licence.
Regulation 19 — Continuance of existing conditions and restrictions in case of change in occupancy.
Regulation 20 — Maintenance of records.
Regulation 21 — Personnel training.
Regulation 22 — Provision for inspection.
Regulation 23 — Owner or occupier to render assistance during inspection.
Regulation 24 — Fee for licence.
Regulation 25 — Waiver of fee.
Regulation 26 — Penalty.
Regulation 27 — Revocation, transitional and savings provision.
Regulation 1 — Citation
The instrument is called the Environmental Quality (Sewage) Regulations 2009.
Regulation 2 — Interpretation
The key terms are:
“Sewage” means liquid waste or wastewater discharge containing human, animal, domestic or putrescible matter in suspension or solution, and includes liquids containing chemicals in raw, treated or partly treated form.
“Sludge” means particulate matter settled from liquid, including matter from physical, chemical, biological or other treatment of sewage.
“Sewage treatment system” means a facility designed and constructed to reduce the pollution potential of sewage.
“Population equivalent” is a fixed-population equivalent of a varying or transient population or activity contributing flow to a sewerage treatment system.
“Dilution” means making sewage less concentrated by adding water or other external liquids, except liquids or materials used for treatment.
“Performance monitoring” means routine monitoring showing whether the treatment process is functional and capable of treating sewage.
Regulation 3 — Application
The Regulations apply to premises discharging sewage onto or into soil, inland waters, or Malaysian waters. They do not apply to housing or commercial development, or both, with a population equivalent below 150.
Regulation 4 — Notification for new sewage discharge
A person must give prior written notification to the Director General before discharging or releasing sewage onto or into soil, inland waters, or Malaysian waters. The notification uses the form in the First Schedule.
Regulation 5 — Proper operation of sewage treatment system
The owner or occupier must operate and maintain the sewage treatment system according to sound engineering practice. The system must be kept in good working condition.
Regulation 6 — Competent person
The sewage treatment system must be supervised by a competent person certified by the Director General. The owner or occupier must ensure that such a competent person is on duty whenever the system is operating.
Regulation 7 — Acceptable sewage discharge conditions
This is the central standard-setting regulation. Sewage must not exceed the limits in the Second Schedule.
For new sewage treatment systems, the important Standard A limits are: temperature 40°C, pH 6.0–9.0, BOD5 at 20°C 20 mg/L, COD 120 mg/L, suspended solids 50 mg/L, oil and grease 5 mg/L, ammoniacal nitrogen for enclosed water body 5 mg/L, ammoniacal nitrogen for river 10 mg/L, nitrate-nitrogen for river 20 mg/L, nitrate-nitrogen for enclosed water body 10 mg/L, and phosphorus for enclosed water body 5 mg/L.
For new sewage treatment systems, the important Standard B limits are: temperature 40°C, pH 5.5–9.0, BOD5 at 20°C 50 mg/L, COD 200 mg/L, suspended solids 100 mg/L, oil and grease 10 mg/L, ammoniacal nitrogen for enclosed water body 5 mg/L, ammoniacal nitrogen for river 20 mg/L, nitrate-nitrogen for river 50 mg/L, nitrate-nitrogen for enclosed water body 10 mg/L, and phosphorus for enclosed water body 10 mg/L.
Standard A applies to discharges into inland waters within listed catchment areas. Standard B applies to other inland waters or Malaysian waters. Existing systems had transitional standards, but the Regulation required existing systems, except communal septic tanks and imhoff tanks, to move toward Standard A by 31 December 2016 for listed catchments and Standard B by 31 December 2019 for other waters.
Regulation 8 — Licence to contravene acceptable conditions
An owner or occupier may apply for a licence under section 25(1) of the Act to contravene the acceptable sewage discharge conditions. The application must follow the Environmental Quality (Licensing) Regulations 1977 and include a sewage characterization study and the required licence fee.
Regulation 9 — Method of analysis and sampling
Sewage analysis may be done in-situ or ex-situ using instruments approved by the Director General. Laboratory analysis must follow recognized methods in the Fourth Schedule. The sample is based on a grab sample, meaning a discrete sample taken within less than 15 minutes.
Regulation 10 — Monitoring of sewage discharge
The owner or occupier must, at their own expense, monitor the Second Schedule parameters and install flow meters, sampling equipment, and recording equipment. Monthly sewage monitoring records must be kept and submitted within the required time.
Regulation 11 — Point of discharge
The discharge point must comply with the Sixth Schedule. It must be shown on layout plans and engineering drawings certified by a professional engineer. Any proposed change to the discharge point or outlet design requires 30 days’ prior notification to the Director General.
Regulation 12 — No sewage by-pass
No person may discharge sewage through a by-pass. A by-pass means an intentional diversion of sewage from any part of the sewage treatment system.
Regulation 13 — Spill or accidental discharge
If sewage is spilled or accidentally discharged and it directly or indirectly gains, or may gain, access to soil, inland waters, or Malaysian waters, the owner or occupier must inform the Director General immediately and not more than six hours from the occurrence. The owner or occupier must contain, cleanse, abate, or remedy the incident to the Director General’s satisfaction. The Director General may recover cleanup costs.
Regulation 14 — No sludge into inland waters or Malaysian waters
Sludge generated from a sewage treatment system must not be discharged into inland waters or Malaysian waters.
Regulation 15 — Sludge disposal onto land
Sludge must not be disposed onto or into soil or land surface without prior written permission from the Director General.
Regulation 16 — Application for sludge disposal
An application for written permission to dispose sludge onto land must be accompanied by a fee of RM500.
Regulation 17 — Reporting material changes
A licence applicant, renewal applicant, or transfer applicant must report material changes in the information given to the Director General within seven days.
Regulation 18 — Display of licence
The licence and documents forming part of it must be displayed in a conspicuous place in the principal building.
Regulation 19 — Change in occupancy
If a new occupier takes over licensed premises, the old licence conditions bind the new occupier for 14 days, or longer if the new occupier applies for transfer within that period and the application remains pending.
Regulation 20 — Maintenance of records
The owner or occupier must keep records of operation, maintenance, and performance monitoring of the sewage treatment system. These must be available for inspection.
Regulation 21 — Personnel training
Employees must be trained on environmental requirements and best practices for sewage treatment-system operation and maintenance. Retraining must cover new, revised, and existing requirements. Training records must be kept.
Regulation 22 — Inspection facilities
Premises discharging sewage must install inspection chambers, flow meters, sampling equipment, monitoring equipment, and measuring/recording equipment.
Regulation 23 — Assistance during inspection
The owner or occupier must provide reasonable assistance and facilities to the Director General or authorized officer, including labour, equipment, appliances, and instruments.
Regulation 24 — Licence fee
The licence fee, including renewal and transfer, is RM500 plus any sewage-related licence fee computed under the Seventh Schedule. The RM500 accompanies the application and is not refundable.
Regulation 25 — Waiver of fee
The Director General may, with ministerial approval, wholly or partly waive the sewage-related licence fee if research on sewage treatment or disposal is likely to benefit environmental protection.
Regulation 26 — Penalty
A person who contravenes the listed regulations commits an offence and is liable to a fine up to RM100,000, imprisonment up to five years, or both, plus a further fine up to RM1,000 per day for continuing offence after notice.
Regulation 27 — Revocation, transitional and savings provision
The old Environmental Quality (Sewage and Industrial Effluents) Regulations 1979 are revoked. However, pending applications, existing licences, written permissions, and pending civil or criminal proceedings under the old Regulations are preserved for transitional purposes.
Schedules to the Sewage Regulations
First Schedule — Notification form for a new source of sewage discharge or release.
Second Schedule — Acceptable conditions of sewage discharge for Standards A and B.
Third Schedule — Catchment areas where Standard A applies. These are water-supply catchments upstream of surface-water or subsurface-water intake points for human consumption.
Fourth Schedule — Methods of analysis. It refers to the 21st edition of Standard Methods for the Examination of Water and Wastewater and the United States Code of Federal Regulations method references.
Fifth Schedule — Monthly sewage discharge monitoring report.
Sixth Schedule — Specifications of the final discharge point: it must be within the treatment-system boundary, after the final treatment unit, accessible, safe for inspection/sampling, physically identified by a metal sign reading “Final Discharge Point,” and kept free from obstruction.
Seventh Schedule — Method for computing sewage-related licence fee. For existing systems, BOD5 and oil and grease are fee parameters. For new systems, BOD5, oil and grease, and ammoniacal nitrogen are fee parameters.
B. Environmental Quality (Industrial Effluent) Regulations 2009
P.U. (A) 434/2009
These Regulations govern industrial effluent and mixed effluent discharged or released onto or into soil, inland waters, or Malaysian waters. “Mixed effluent” means wastewater containing both industrial effluent and sewage. The Department of Environment hosts this instrument as the Environmental Quality (Industrial Effluent) Regulations 2009 — P.U. (A) 434/2009.
Arrangement of Regulations
Regulation 1 — Citation.
Regulation 2 — Interpretation.
Regulation 3 — Application.
Regulation 4 — Obligation to notify the Director General.
Regulation 5 — Design and construction of industrial effluent treatment system.
Regulation 6 — Compliance with specifications of industrial effluent treatment system.
Regulation 7 — Monitoring of discharge of industrial effluent or mixed effluent.
Regulation 8 — Proper operation of industrial effluent treatment system.
Regulation 9 — Performance monitoring of effluent treatment system.
Regulation 10 — Competent person.
Regulation 11 — Acceptable conditions for discharge of industrial effluent other than COD.
Regulation 12 — Acceptable conditions for discharge of industrial effluent for COD.
Regulation 13 — Acceptable conditions for discharge of mixed effluent for COD.
Regulation 14 — Best management practice for other parameters
.
Regulation 15 — Licence to contravene acceptable conditions.
Regulation 16 — Methods of analysis and sampling.
Regulation 17 — Point of discharge.
Regulation 18 — Prohibition against discharge through by-pass.
Regulation 19 — Dilution of industrial effluent or mixed effluent.
Regulation 20 — Spill, accidental discharge or leakage.
Regulation 21 — Prohibited substances.
Regulation 22 — Changes that alter effluent quality.
Regulation 23 — Restriction on discharge or disposal of
sludge.
Regulation 24 — Reporting changes in information furnished for licence application.
Regulation 25 — Display of licence.
Regulation 26 — Change in occupancy.
Regulation 27 — Maintenance of record.
Regulation 28 — Personnel training.
Regulation 29 — Assistance during inspection.
Regulation 30 — Prohibition order.
Regulation 31 — Licence fee.
Regulation 32 — Penalty.
Regulation 33 — Revocation, transitional and savings provision.
Regulation 1 — Citation
The instrument is called the Environmental Quality (Industrial Effluent) Regulations 2009.
Regulation 2 — Interpretation
The key terms are:
“Industrial effluent” means liquid waste or wastewater generated from manufacturing processes, water treatment for water supply, or activities at industrial premises.
“Mixed effluent” means wastewater containing both industrial effluent and sewage.
“Best management practices” means practical structural or non-structural methods to prevent or reduce industrial effluent or mixed effluent containing contaminants.
“Industrial effluent treatment system” means the treatment facility, including the effluent collection system, designed and constructed to reduce the pollution potential of industrial effluent or mixed effluent.
“Batch discharge” means controlled discharge of a discrete volume of industrial effluent or mixed effluent.
“Sludge” includes settled particulate matter from liquids, including physical, chemical, biological, or other treatment of water, industrial effluent, or mixed effluent.
Regulation 3 — Application
The Regulations apply to premises discharging or releasing industrial effluent or mixed effluent onto or into soil, inland waters, or Malaysian waters, except premises listed in the First Schedule.
Regulation 4 — Obligation to notify the Director General
A person must give prior written notification to the Director General before creating a new source of industrial effluent or mixed effluent discharge, constructing facilities that may create such discharge, changing plant/machinery/equipment in a way that materially changes discharge quantity or quality, or upgrading an existing industrial effluent treatment system in a way that materially changes discharge quantity or quality.
The notification must be submitted in the Second Schedule form within 30 days before the work, construction, upgrading, or change begins.
Regulation 5 — Design and construction of industrial effluent treatment system
The owner or occupier must design and construct the industrial effluent treatment system according to the Department of Environment’s guidance document on design and operation of industrial effluent treatment systems.
A professional engineer must design and supervise the construction. The owner or occupier and the professional engineer must submit a written declaration that the design and construction comply with the required specifications. As-built drawings must be submitted not later than 30 days after the premises begin operation.
Regulation 6 — Compliance with treatment-system specifications
A person must not operate an industrial effluent treatment system unless it complies with the required specifications. The Director General may order repair, alteration, replacement, additional equipment or instruments, or performance monitoring at the owner’s or occupier’s expense.
Regulation 7 — Monitoring of industrial effluent or mixed effluent
The owner or occupier must monitor COD and Fifth Schedule parameters, install flow meters, sampling equipment, monitoring equipment, and recording equipment, maintain monthly discharge monitoring records in the Tenth Schedule form, submit the first record within 30 days of commencement of the Regulations, and submit later records within 30 days after each calendar month.
Regulation 8 — Proper operation
The industrial effluent treatment system must be operated and maintained according to sound engineering practice. All components must be kept in good working condition.
Regulation 9 — Performance monitoring
The owner or occupier must conduct performance monitoring of treatment-system components according to the Department of Environment’s performance-monitoring guidance, and must have the facilities, equipment, and instruments needed for that monitoring.
Regulation 10 — Competent person
The industrial effluent treatment system must be supervised by a competent person certified by the Director General. The owner or occupier must ensure the competent person is on duty whenever the system is operating.
Regulation 11 — Acceptable conditions other than COD
Industrial effluent must not exceed the Standard A or Standard B limits in the Fifth Schedule.
Important Fifth Schedule limits are:
For Standard A and Standard B respectively: temperature 40°C and 40°C; pH 6.0–9.0 and 5.5–9.0; BOD at 20°C 20 mg/L and 50 mg/L; suspended solids 50 mg/L and 100 mg/L; mercury 0.005 mg/L and 0.05 mg/L; cadmium 0.01 mg/L and 0.02 mg/L; hexavalent chromium 0.05 mg/L and 0.05 mg/L; trivalent chromium 0.20 mg/L and 1.0 mg/L; arsenic 0.05 mg/L and 0.10 mg/L; cyanide 0.05 mg/L and 0.10 mg/L; lead 0.10 mg/L and 0.5 mg/L; copper 0.20 mg/L and 1.0 mg/L; manganese 0.20 mg/L and 1.0 mg/L; nickel 0.20 mg/L and 1.0 mg/L; tin 0.20 mg/L and 1.0 mg/L; zinc 2.0 mg/L and 2.0 mg/L; boron 1.0 mg/L and 4.0 mg/L; iron 1.0 mg/L and 5.0 mg/L; silver 0.1 mg/L and 1.0 mg/L; aluminium 10 mg/L and 15 mg/L; selenium 0.02 mg/L and 0.5 mg/L; barium 1.0 mg/L and 2.0 mg/L; fluoride 2.0 mg/L and 5.0 mg/L; formaldehyde 1.0 mg/L and 2.0 mg/L; phenol 0.001 mg/L and 1.0 mg/L; free chlorine 1.0 mg/L and 2.0 mg/L; sulphide 0.50 mg/L and 0.50 mg/L; oil and grease 1.0 mg/L and 10 mg/L; ammoniacal nitrogen 10 mg/L and 20 mg/L; colour 100 ADMI and 200 ADMI.
Where two or more listed metals are present, total metal limits also apply. Where Standard B applies and both phenol and free chlorine are present, phenol must not exceed 0.2 mg/L and free chlorine must not exceed 1 mg/L.
Regulation 12 — COD standards for industrial effluent
For industrial effluent, COD limits depend on the trade or industry sector in the Seventh Schedule. The limits are:
For pulp mill: Standard A 80 mg/L, Standard B 350 mg/L.
For recycled paper mill: Standard A 80 mg/L, Standard B 250 mg/L.
For pulp and paper mill: Standard A 80 mg/L, Standard B 300 mg/L.
For textile industry: Standard A 80 mg/L, Standard B 250 mg/L.
For fermentation and distillery industry: Standard A 400 mg/L, Standard B 400 mg/L.
For other industries: Standard A 80 mg/L, Standard B 200 mg/L.
Regulation 13 — COD standards for mixed effluent
Mixed effluent containing COD must not exceed Standard A 80 mg/L or Standard B 200 mg/L.
Regulation 14 — Best management practice for other parameters
The owner or occupier must adopt best management practice for the Ninth Schedule parameters, including nitrate nitrogen, sulphate, chloride, cobalt, anionic detergent, molybdenum, phosphate, PCBs, beryllium, vanadium, pesticides and other biocides, odour/gas/fume-producing substances, total organic carbon, whole effluent toxicity, dioxin, and endocrine disruptors.
Regulation 15 — Licence to contravene acceptable conditions
A person may apply for a licence under section 25(1) of the Act to contravene regulations 11, 12, and 13. The application must follow the Environmental Quality (Licensing) Regulations 1977 and include an industrial effluent characterization study and the required licence/effluent-related fee.
Regulation 16 — Methods of analysis and sampling
An authorized officer may conduct in-situ or ex-situ analysis using instruments approved by the Director General. Analysis must follow the Fourth Schedule methods, and samples are based on grab samples taken within less than 15 minutes.
Regulation 17 — Point of discharge
The discharge point must comply with the Eleventh Schedule. It must be shown on layout plans or engineering drawings certified by a professional engineer and submitted 30 days before operation. Any proposed alteration or change to the discharge point or outlet design requires 30 days’ prior notification to the Director General.
Regulation 18 — No discharge through by-pass
No person may discharge industrial effluent or mixed effluent through a by-pass. A by-pass is any diversion from any portion of an industrial effluent treatment system.
Regulation 19 — No dilution
No person may dilute industrial effluent or mixed effluent, whether raw or treated, after it is produced. The Regulation defines dilution as making the effluent less concentrated by adding external water or other liquids, except materials used for treatment.
Regulation 20 — Spill, accidental discharge or leakage
If a spill, accidental discharge, or leakage directly or indirectly gains or may gain access to soil, inland waters, or Malaysian waters, the owner or occupier must inform the Director General immediately and within six hours. The owner or occupier must contain, cleanse, abate, or recover the effluent to the Director General’s satisfaction. The Director General may determine damage and recover costs.
Regulation 21 — Prohibited substances
No person may discharge industrial effluent or mixed effluent containing inflammable solvent, tar or other water-immiscible liquids, sawdust or wood waste, or sludge into soil, inland waters, or Malaysian waters.
Regulation 22 — Changes that alter quality or quantity
A licence holder must not change premises, operations, processes, machinery, equipment, channeling systems, or plant in a way likely to materially increase the quantity or quality of industrial effluent or mixed effluent unless prior written permission is obtained.
Regulation 23 — Sludge restriction
Sludge from production, manufacturing, industrial effluent treatment, or water treatment must not be discharged or disposed onto land, into soil, inland waters, or Malaysian waters without prior written permission from the Director General.
Regulation 24 — Reporting material changes
A licence applicant, renewal applicant, or transfer applicant must report material changes in information within seven days.
Regulation 25 — Display of licence
The licence and all documents forming part of it must be displayed in a conspicuous place in the principal building.
Regulation 26 — Change in occupancy
A new occupier is bound by existing licence conditions for 14 days after the change in occupancy, or longer if the new occupier applies for transfer within that period and the application remains pending.
Regulation 27 — Maintenance of records
The owner or occupier must keep records of manufacturing processes, operation, maintenance, and performance monitoring of the industrial effluent treatment system. These records must be available for inspection.
Regulation 28 — Personnel training
Employees must attend training on environmental requirements and best management practices before beginning work. Retraining must be provided for new, revised, and existing requirements. Training records must be kept.
Regulation 29 — Assistance during inspection
The owner or occupier must provide reasonable assistance and facilities to the Director General or authorized officer, including labour, equipment, appliances, and instruments.
Regulation 30 — Prohibition order
For undesirable occurrences listed in the Twelfth Schedule, the Director General may issue a prohibition order stopping further operation of an industrial plant or process absolutely or conditionally, for a specified period, or until remedial measures are completed. The Director General or authorized officer may render the plant or process inoperative.
Regulation 31 — Licence fee
The licence fee is RM500 plus an effluent-related licence fee calculated under the Thirteenth Schedule. The transfer fee is RM100. If the Director General refuses the licence application, only the effluent-related fee is refundable.
Regulation 32 — Penalty
A person who contravenes listed regulations commits an offence and is liable to a fine up to RM100,000, imprisonment up to five years, or both, plus a further fine up to RM1,000 per day for continuing offence after notice.
Regulation 33 — Revocation, transitional and savings provision
The old Environmental Quality (Sewage and Industrial Effluents) Regulations 1979 are revoked. Pending applications, existing licences, written permissions, and pending civil or criminal proceedings under the old Regulations are preserved for transitional purposes.
Schedules to the Industrial Effluent Regulations
First Schedule — Premises excluded from the Regulations. These include crude palm oil processing, natural rubber processing, mining activities, and small dischargers below listed volume/loading/contaminant thresholds.
Second Schedule — Notification form for new or altered sources of industrial effluent or mixed effluent.
Third Schedule — Declaration form confirming proper design and construction of the industrial effluent treatment system.
Fourth Schedule — Methods of analysis, including the 21st edition of Standard Methods for the Examination of Water and Wastewater and the United States Code of Federal Regulations method references.
Fifth Schedule — Standard A and Standard B limits for industrial effluent or mixed effluent other than COD.
Sixth Schedule — Catchment areas where Standard A applies.
Seventh Schedule — COD limits for specific industries.
Eighth Schedule — COD limits for mixed effluent: Standard A 80 mg/L and Standard B 200 mg/L.
Ninth Schedule — Best management practice parameters: nitrate nitrogen, sulphate, chloride, cobalt, anionic detergent, molybdenum, phosphate, PCBs, beryllium, vanadium, pesticides and other biocides, substances causing gas/fume/odour/pollution, total organic carbon, whole effluent toxicity, dioxin, and endocrine disruptors.
Tenth Schedule — Monthly industrial effluent or mixed effluent monitoring report, including identification details, laboratory details, reporting month/year, flow rate, and parameter results.
Eleventh Schedule — Specifications of the final discharge point. It must be within the premises boundary, immediately after the final treatment unit, accessible and safe, discharged through a pipe/conduit/channel for sampling, physically marked with “Final Discharge Point,” and kept free from obstruction.
Twelfth Schedule — Undesirable occurrences allowing prohibition orders. These include serious pollution threatening the environment or public health and safety; industrial disasters such as fire or explosion causing environmental or public risk; serious pollution giving rise to justified frequent complaints; repeated similar offences despite notices/directives/compounds/court action; serious negative impact on aquatic life; serious pollution with wide media coverage caused by absence, non-operation, or malfunctioning of treatment systems; and grossly non-compliant untreated or partly treated discharge or discharge through by-pass.
Thirteenth Schedule — Method for computing effluent-related licence fee. BOD5 at 20°C is charged at RM0.50 per kg for Standard A/catchment inland waters and RM0.05 per kg for other waters/soil. High-toxicity contaminants such as mercury, cadmium, chromium, arsenic, cyanide, lead, copper, manganese, nickel, tin, silver, selenium, barium, fluoride, formaldehyde, and zinc are generally charged at RM2,500 per kg for Standard A/catchment inland waters and RM250 per kg for other waters/soil. Other listed contaminants such as boron, iron, phenol, sulphide, oil and grease, and ammoniacal nitrogen are charged at RM500 per kg for Standard A/catchment inland waters and RM50 per kg for other waters/soil.
Simple Legal Meaning
The Sewage Regulations 2009 deal with domestic/human wastewater and sewage treatment systems.
The Industrial Effluent Regulations 2009 deal with factory/process wastewater and mixed factory-plus-sewage wastewater.
The 1979 Regulations were a combined old instrument. The 2009 law split the subject into separate, more detailed regimes: one for sewage and one for industrial effluent, with modern duties on notification, competent persons, monitoring, final discharge points, no bypassing, no dilution, spill reporting within six hours, records, training, inspection, licence fees, and stronger operational controls.
Environmental Quality (Sewage and Industrial Effluents) Regulations 1979
The Regulations are a classic Malaysian environmental-control instrument. They regulate sewage and industrial effluent mainly through prior permission, acceptable discharge standards, sampling and analysis, licensing for limited contravention, anti-dilution rules, spill duties, inspection infrastructure, and fee-based pollution loading. The legal theory is simple but powerful: a person may not simply discharge wastewater into rivers, drains, canals, lakes, wells, land, or soil and then argue that the discharge is ordinary business. The discharge is lawful only if it fits within the regulatory scheme.
A current-status note is important. The 1979 Regulations were later revoked by the Environmental Quality (Sewage) Regulations 2009 and the Environmental Quality (Industrial Effluent) Regulations 2009, both of which contain revocation, transitional, and savings provisions for the 1979 Regulations. The 2009 sewage instrument expressly says the 1979 Sewage and Industrial Effluents Regulations are revoked, while preserving pending applications, existing licences, and some transitional discharge standards; the 2009 industrial-effluent instrument also states that the 1979 Regulations are revoked and preserves certain pre-existing licences and written permissions.
List of Contents of the 1979 Regulations
The Regulations are organized as follows:
Part I: Preliminary — regulations 1 to 3.
Part II: New Sources of Discharge — regulations 4 to 5.
Part III: Acceptable Conditions of Discharge into Inland Waters — regulations 6 to 8.
Part IV: Discharge of Effluent and Sludge onto Land — regulations 9 to 10.
Part V: Licence for Contravention of Acceptable Conditions — regulations 11 to 15.
Part VI: Miscellaneous — regulations 16 to 20.
Part VII: Fees — regulations 21 to 24.
First Schedule: Discharges to which the Regulations do not apply.
Second Schedule: Standard methods of analysis of effluent.
Third Schedule: Parameter limits for Standard A and Standard B.
Fourth Schedule: Catchment areas where Standard A applies.
Fifth Schedule: Extra parameters whose limits may be specified by the Director General.
Sixth Schedule: Alternative parameter limits for certain licensed contraventions.
Seventh Schedule: Method of computing the effluent-related licence fee.
Executive Research Summary
The 1979 Regulations are built on seven legal ideas.
First, the receiving environment matters. If effluent enters protected water-supply catchments, Standard A applies. If it enters other inland waters, Standard B applies. Standard A is stricter because the risk to drinking-water sources is higher. Regulation 8 states that Standard A applies to inland waters within catchment areas listed in the Fourth Schedule, while Standard B applies to other inland waters.
Second, some substances are prohibited outright. Regulation 6 prohibits discharge of inflammable solvents, tar or immiscible liquids, refuse, garbage, sawdust, timber, human or animal waste, and solid matters into inland waters. This is not merely a concentration-limit rule. It is a categorical prohibition.
Third, sampling location is legally decisive. Regulation 16 makes the Director General’s determined point of discharge the legal point at which parameter concentrations are assessed. A company cannot choose a convenient sampling point upstream or downstream to make results look better.
Fourth, dilution is controlled. Regulation 17 prevents a polluter from making effluent appear compliant merely by adding water after the effluent is produced, unless written authorization is obtained and the dilution follows the terms of that authorization.
Fifth, land disposal is not a loophole. Regulations 9 and 10 require prior written permission for discharge of effluent, solid waste, or sludge onto soil or land. This links the Regulations with the wider statutory prohibition against soil pollution.
Sixth, licensing is exceptional, not automatic. Regulation 11 allows an application for a licence to contravene acceptable discharge limits, but the Director General may refuse if the licence would worsen inland waters or pollute another environmental segment. The Director General may grant such a licence only on specified grounds such as absence of practicable control means, prohibitive cost, need for more time to design or commission treatment plant, impracticability, or connection to a sewerage system.
Seventh, current enforcement risk is now much higher under the principal Act. The Environmental Quality (Amendment) Act 2024 amended section 25 of the Environmental Quality Act 1974 so that a contravention of the inland-water pollution provision is punishable by imprisonment up to five years and a fine from RM50,000 to RM10,000,000.
Part I: Preliminary
Regulation 1 — Citation and commencement
Regulation 1 gives the instrument its formal title: Environmental Quality (Sewage and Industrial Effluents) Regulations 1979. It deems the Regulations to have come into force on 1 January 1979, except that sources already existing before that date were given until 1 January 1981.
The transitional period matters legally. It recognizes that existing industries could not always instantly install treatment systems. But the delay was not a permanent exemption. It was a compliance runway.
Regulation 2 — Interpretation
Regulation 2 defines the central operational terms: “effluent,” “industrial effluent,” “inland waters,” “licence,” “licensed premises,” “parameter,” “sewage,” “sewer,” “sewerage system,” and “treatment plant.”
The most important definition is “effluent,” which means sewage or industrial effluent. This allows the same legal machinery to regulate both human/domestic wastewater and industrial-process wastewater. “Industrial effluent” is tied to production processes at industrial premises. “Sewage” is broader because it includes liquid waste containing animal or vegetable matter and may include liquids containing chemicals in solution.
The definition of “inland waters” is deliberately broad. It includes reservoirs, ponds, lakes, rivers, streams, canals, drains, springs, wells, parts of the sea abutting the foreshore, and natural or artificial surface or subsurface waters. This prevents a polluter from saying, “I did not discharge into a river; I discharged into a drain.” A drain is still within the regulatory idea of inland waters.
Regulation 3 — Application
Regulation 3 applies the Regulations to discharges of effluent into inland waters, except effluents from prescribed premises or other premises specified in the First Schedule. The First Schedule excludes, among others, crude palm oil processing, natural rubber processing, mining activities, and certain small-scale sources below the listed thresholds.
The important legal point is that the exclusions are not absolute freedom to pollute. The First Schedule itself is subject to regulation 6. So even excluded premises cannot discharge the prohibited materials listed in regulation 6 into inland waters.
Part II: New Sources of Discharge
Regulation 4 — Prohibition against new and altered sources of effluent discharge
Regulation 4 requires prior written permission from the Director General before a person carries out work that may create a new source of effluent discharge or materially change the quantity or quality of discharge from an existing source. It also applies to construction of buildings designed or used for purposes that may create new effluent discharge.
This is preventive environmental law. It stops a factory, commercial development, or treatment facility from being built first and regulated later. The legal question is not only “Did pollution already occur?” but also “Will the proposed work create a new discharge risk?”
Regulation 5 — Requirement and approval plan
Regulation 5 requires an application to be submitted to the Director General in the prescribed form with the prescribed fee. The Director General may grant the application with or without conditions and may require the applicant to repair, alter, replace or install control equipment, or conduct or pay for a monitoring programme.
The regulatory purpose is to convert engineering design into enforceable legal control. The Director General may demand treatment systems and monitoring before the discharge begins.
Sample: application outline under regulations 4 and 5
Subject: Application for written permission for proposed new effluent discharge source.
Applicant: ABC Manufacturing Sdn Bhd.
Premises: Lot 10, Industrial Area X.
Proposed work: Installation of a new metal-finishing line and wastewater treatment unit.
Expected effluent volume: 80 cubic metres per day.
Expected discharge point: Final outlet chamber after treatment plant, before entry into factory perimeter drain.
Receiving water: Inland drain connected to Sungai X.
Proposed control equipment: Equalization tank, pH adjustment unit, chemical precipitation unit, clarifier, sludge filter press, final polishing tank.
Monitoring proposal: Daily pH and flow readings; weekly COD, BOD, suspended solids and selected metals; monthly laboratory report.
Attachments: Layout plan, process flow diagram, mass balance, treatment design calculation, emergency spill plan, proposed sampling chamber design, and fee payment receipt.
Part III: Acceptable Conditions of Discharge into Inland Waters
Regulation 6 — Prohibition of discharge of effluent containing certain substances
Regulation 6 prohibits discharge of three categories of substances into inland waters: inflammable solvents; tar or other liquids immiscible with water; and refuse, garbage, sawdust, timber, human or animal waste, or solid matters.
This section is strict in tone. It does not say that these materials may be discharged if below a concentration limit. It says they must not be discharged. A factory cannot treat a river as a disposal channel for floating solids, immiscible liquids, or combustible solvent residues.
Regulation 7 — Standard methods of analysis
Regulation 7 requires effluent analysis to follow the methods specified in the Second Schedule, namely the recognized Standard Methods for the Examination of Water and Wastewater, or other methods the Director General thinks fit.
This is evidentially important. In prosecutions or licence disputes, the reliability of the sample depends not only on the numerical result but also on whether the correct method was used. A laboratory number without a recognized method is legally vulnerable.
Regulation 8 — Parameter limits for effluent into inland waters
Regulation 8 is the technical core of the Regulations. It prohibits discharge of effluent containing substances above Standard A or Standard B limits. Standard A applies to inland waters within listed catchment areas. Standard B applies to other inland waters. Regulation 8 also includes special rules for combined metals and for the combined presence of phenol and free chlorine.
The Third Schedule lists major effluent parameters. Examples include temperature, pH, BOD5, COD, suspended solids, mercury, cadmium, hexavalent chromium, arsenic, cyanide, lead, trivalent chromium, copper, manganese, nickel, tin, zinc, boron, iron, phenol, free chlorine, sulphide, and oil and grease.
Standard A is stricter in many key respects. BOD5 is limited to 20 mg/L under Standard A and 50 mg/L under Standard B. COD is 50 mg/L under Standard A and 100 mg/L under Standard B. Suspended solids are 50 mg/L under Standard A and 100 mg/L under Standard B. Mercury is 0.005 mg/L under Standard A and 0.05 mg/L under Standard B. Oil and grease must be “not detectable” under Standard A, while Standard B allows 10 mg/L.
Sample: Standard A compliance analysis
Assume the discharge is into a listed water-supply catchment, so Standard A applies.
The sample results are:
Temperature 38°C. This complies because Standard A allows 40°C.
pH 7.2. This complies because Standard A allows pH 6.0 to 9.0.
BOD5 18 mg/L. This complies because Standard A allows 20 mg/L.
COD 55 mg/L. This does not comply because Standard A allows 50 mg/L.
Suspended solids 45 mg/L. This complies because Standard A allows 50 mg/L.
Copper 0.25 mg/L. This does not comply because Standard A allows 0.20 mg/L.
Oil and grease not detected. This complies because Standard A requires oil and grease to be not detectable.
Legal conclusion: The discharge fails Standard A because COD and copper exceed the limits. The operator must treat the effluent further, obtain a lawful licence where available, or stop the non-compliant discharge.
Sample: Standard B compliance analysis with phenol and chlorine
Assume the discharge is into other inland waters, so Standard B applies.
The sample results are:
pH 5.4. This fails because Standard B requires pH 5.5 to 9.0.
BOD5 45 mg/L. This passes because Standard B allows 50 mg/L.
COD 105 mg/L. This fails because Standard B allows 100 mg/L.
Phenol 0.3 mg/L and free chlorine 1.2 mg/L are both present.
Even though the Third Schedule generally allows phenol up to 1.0 mg/L and free chlorine up to 2.0 mg/L under Standard B, regulation 8(3) creates a special combined-presence rule. Where both are present, phenol must not exceed 0.2 mg/L and free chlorine must not exceed 1 mg/L. On those facts, both fail.
Part IV: Discharge of Effluent and Sludge onto Land
Regulation 9 — Restriction on discharge of effluents onto land
Regulation 9 prohibits discharge of effluent in or on soil or land surface without prior written permission of the Director General.
This is crucial because land disposal can become groundwater pollution. A party cannot escape water-discharge standards simply by spraying wastewater onto land, using soakaway pits, or directing effluent into soil.
Regulation 10 — Restriction on disposal of sludges
Regulation 10 prohibits discharge of solid waste or sludge generated from production, manufacturing, or an effluent treatment plant onto soil or land without prior written permission.
Sludge is legally dangerous because it concentrates contaminants. A treatment plant that removes metals or solids from wastewater may create a sludge that is more hazardous than the original liquid. Regulation 10 closes that loophole.
Sample: land/sludge permission request
Subject: Request for permission to dispose treated sludge onto designated land.
Premises: ABC Manufacturing Sdn Bhd.
Source of sludge: Chemical precipitation unit and clarifier from industrial effluent treatment system.
Quantity: Approximately 400 kg wet sludge per week.
Moisture content: 65%.
Analytical profile: Copper, zinc, suspended solids, pH, oil and grease, and other relevant contaminants.
Proposed land location: Secured lined drying bed within premises, not open soil.
Control measures: Impermeable base, leachate collection, roof cover, bunding, disposal log, scheduled collection by approved contractor where required.
Undertaking: No land application or burial unless expressly permitted in writing by the Director General.
Part V: Licence for Contravention of Acceptable Conditions
Regulation 11 — Acceptable conditions which may be contravened
Regulation 11 allows a person to apply for a licence to contravene acceptable effluent conditions under regulation 8. But this is not a right to pollute. It is a controlled exception linked to section 25 of the Environmental Quality Act 1974.
The Director General may refuse if granting the licence is likely to worsen inland waters or cause pollution elsewhere. He may grant it if satisfied that there is no known practicable control, compliance cost is prohibitive having regard to the industry’s nature and size, treatment plant design and commissioning need more time, strict conditions are not reasonably practicable or are contrary to the Act’s purpose, or a sewerage system will receive the effluent.
Sample: licence justification under regulation 11
Legal basis: Application for licence to contravene regulation 8 acceptable conditions.
Applicant’s argument:
ABC Manufacturing Sdn Bhd has installed a treatment system and achieves Standard B for all parameters except COD during commissioning. The COD level is expected to fall from 130 mg/L to below 100 mg/L within four months after biological treatment stabilizes. The applicant seeks a temporary licence condition allowing a staged reduction.
Evidence required:
A treatment design report; commissioning schedule; monthly monitoring plan; proof that no water-supply catchment is affected; risk assessment; proposed interim limit; emergency stop-discharge procedure; and proof that the contravention will not worsen inland water quality.
Director General’s legal question:
Is this a genuine temporary technical problem, or an attempt to normalize unlawful pollution? If the discharge is likely to worsen inland waters, regulation 11(3) supports refusal.
Regulation 12 — Reporting changes in information furnished for application
Regulation 12 requires an applicant for a licence, renewal, or transfer to report any material change in application information within seven days.
This duty prevents “application by ambush.” A company cannot apply on the basis of one production process and then quietly switch to another process that produces different wastewater.
Sample: seven-day change report
Subject: Report of material change under regulation 12.
On 10 March 2026, ABC Manufacturing Sdn Bhd changed its production schedule by adding a nickel-plating process. This change may alter the quality of industrial effluent by adding nickel and increasing total dissolved solids. The company will not commence discharge from the new process until the Director General has reviewed the revised effluent characterization and treatment proposal. Updated flow diagrams, expected effluent quality, monitoring plan, and treatment modifications are attached.
Regulation 13 — Making changes that alter quality of effluent
Regulation 13 prohibits a licence holder from changing the premises, operations, processes, plant, machines, equipment, or channeling systems where the change causes, is intended to cause, or is likely to cause a material increase in effluent quantity or quality, unless prior written approval is obtained.
The word “quality” here means the characteristics of the effluent, not whether it is good or bad in ordinary language. A material change in quality may include higher COD, new heavy metals, altered pH, higher temperature, oil and grease, or different toxicity.
Regulation 14 — Display of licence
Regulation 14 requires the licence and all documents forming part of it to be displayed conspicuously in the principal building of the premises.
This is not merely clerical. Display supports inspection, internal compliance, and managerial accountability. A hidden licence is harder for workers, officers, and auditors to verify.
Regulation 15 — Continuance of conditions where occupancy changes
Regulation 15 binds a new occupier to existing licence conditions for fourteen days after change in occupancy, or longer if the new occupier applies within that period for transfer of the licence until the application is finally determined.
This is a continuity rule. Environmental obligations do not disappear because the business changes hands.
Sample: acquisition due diligence question
A buyer acquiring a factory should ask:
Does the factory have a current effluent licence?
What are the licence conditions?
Are there pending notices from the Director General?
Were any contraventions licensed under regulation 11?
Has any material process change occurred without approval?
Are monitoring records complete?
Is the discharge point physically the same as the approved point?
Are sludge-disposal permissions available?
Are there unpaid effluent-related fees?
Part VI: Miscellaneous
Regulation 16 — Point of discharge
Regulation 16 allows the Director General to determine the discharge point. The outlet’s position and design cannot be altered without prior written approval. Concentration references in the Regulations refer to the concentration at the determined point of discharge.
This is one of the most important enforcement rules. If a factory samples before untreated sidestreams enter the final outlet, the result may be misleading. Regulation 16 fixes the legal sampling point.
Regulation 17 — Dilution of effluent
Regulation 17 prohibits dilution of raw or treated effluent after production unless prior written authorization is obtained and the dilution follows the terms and conditions of that authorization.
This is a strong anti-evasion rule. Without it, a factory could add clean water to reduce mg/L concentrations while releasing the same total pollutant mass.
Sample: dilution issue
A plant produces 10 m³/day of effluent with COD 200 mg/L. It adds 10 m³/day of clean water, making COD appear as 100 mg/L. If Standard B applies, the plant may argue it now meets COD 100 mg/L. Regulation 17 prevents that argument unless the dilution was authorized. The law looks at genuine treatment, not cosmetic dilution.
Regulation 18 — Spill or accidental discharge
Regulation 18 requires the responsible person to immediately inform the Director General where a spill or accidental discharge of substances specified in regulation 8 directly or indirectly gains, or may gain, access to inland waters. The responsible person must contain, cleanse, abate, or recover the substances to the Director General’s satisfaction, and the Director General may estimate damage and recover costs.
Sample: immediate spill notification
Subject: Immediate notification of accidental discharge under regulation 18.
At approximately 9:20 a.m. on 12 May 2026, a transfer hose failed at ABC Manufacturing Sdn Bhd, releasing approximately 300 litres of partially treated effluent containing suspended solids and copper into the internal drainage channel near Discharge Point 1. The drain connects to Sungai X. The discharge was stopped at 9:35 a.m. Temporary bunds and absorbent barriers were placed at the drain outlet. Recovery pumping began at 9:45 a.m. Samples have been taken from the internal drain, final outlet, and downstream receiving water. The suspected cause is hose rupture during transfer. Corrective action includes hose replacement, secondary containment, and retraining of operators.
Regulation 19 — Provisions for inspection
Regulation 19 requires persons who discharge effluent into inland waters or onto land to install sampling test points, inspection chambers, flow meters, recording apparatus, and other equipment required by the Director General.
This provision turns inspection into engineering reality. Without a sampling chamber and flow meter, enforcement becomes guesswork.
Regulation 20 — Occupier to render assistance during inspections
Regulation 20 requires the occupier to provide the Director General or authorized officer reasonable assistance and facilities, including labour, equipment, appliances, and instruments needed for action under section 38 of the Act.
This means an occupier cannot simply stand aside and say the officer must figure everything out alone. Environmental inspection often requires safe access, lifting covers, operating valves, identifying sampling points, and producing records.
Part VII: Fees
Regulation 21 — Fee for written permission
Regulation 21 fixes the fee for written permission under regulation 4 at RM100.
Regulation 22 — Fee for licence and renewal
Regulation 22 sets the licence fee at RM100 plus an effluent-related amount calculated under the Seventh Schedule. The RM100 accompanies the application and is non-refundable.
Regulation 23 — Waiver of fee
Regulation 23 allows the Director General, with ministerial approval, to wholly or partly waive the effluent-related amount if research on effluent disposal or treatment is being carried out and is likely to benefit environmental protection.
This is an early form of regulatory encouragement for innovation. It rewards research that improves effluent treatment rather than merely punishing failure.
Regulation 24 — Fee for transfer of licence
Regulation 24 sets the transfer fee at RM30.
Schedule Analysis
First Schedule — Exclusions
The First Schedule excludes certain discharges from the Regulations, including crude palm oil processing, natural rubber processing, mining activities, and certain smaller processing, manufacturing, washing, or servicing operations below specified volume and loading thresholds. But the exclusion is subject to regulation 6, meaning the prohibited substances rule still matters.
Legally, this is a jurisdictional filter. It prevents the general sewage-and-industrial-effluent regime from overlapping completely with specialized prescribed-premises regimes such as crude palm oil and raw natural rubber.
Second Schedule — Analytical methods
The Second Schedule points to Standard Methods for the Examination of Water and Wastewater. This imports scientific credibility into legal enforcement. It also means legal compliance depends on laboratory quality, sampling integrity, preservation, chain of custody, and method selection.
Third Schedule — Standard A and Standard B
The Third Schedule is the heart of effluent quality control. It sets numerical limits for physical parameters, organic pollution indicators, metals, toxic substances, and oil and grease.
The most important practical parameters are usually BOD5, COD, suspended solids, pH, oil and grease, and industry-specific metals. BOD5 indicates biodegradable organic load. COD measures oxidizable substances more broadly. Suspended solids affect turbidity and sedimentation. Metals such as mercury, cadmium, lead, chromium, copper, nickel, tin, zinc, and arsenic introduce toxicity concerns.
Fourth Schedule — Catchment areas where Standard A applies
The Fourth Schedule lists catchment areas upstream of surface or above subsurface water-supply intakes for human consumption, including drinking. The legal effect is that effluent entering those protected areas must meet Standard A.
The policy is clear: water-supply protection receives stricter control than ordinary receiving waters.
Fifth Schedule — Additional parameters
The Fifth Schedule includes parameters whose limits may be specified by the Director General, including ammoniacal nitrogen, sulphate, chloride, cobalt, colour, detergents, fluoride, molybdenum, nitrate nitrogen, phosphate, PCBs, selenium, silver, beryllium, vanadium, radioactive material, pesticides and other biocides, chlorinated hydrocarbons, and substances that may create gas, fumes, odour, or pollution.
This Schedule gives the Director General flexibility. It recognizes that no fixed schedule can predict every industrial pollutant.
Sixth Schedule — Alternative licensed limits
The Sixth Schedule supplies parameter limits other than Standard A or B for use in certain licence conditions, especially where effluent is admitted into a sewerage system or where a licence to contravene acceptable conditions is granted. The limits are much less stringent than Standard A and B, showing that this Schedule is not a normal environmental discharge standard but a controlled exception.
Seventh Schedule — Effluent-related licence fee
The Seventh Schedule calculates licence fees by pollution loading. It considers organic loading measured by BOD5, toxic contaminants such as metals, and other contaminants such as zinc, boron, iron, phenol, free chlorine, sulphide, and oil and grease. Higher-risk catchment discharges attract higher fees than other inland waters.
Sample: effluent-related licence fee calculation
Assume a plant discharges into ordinary inland waters where Standard B applies.
Annual discharge volume: 80 m³/day for 300 days.
Total volume: 24,000 m³, or 24,000,000 litres.
BOD5 concentration: 40 mg/L.
Copper concentration: 0.3 mg/L.
Zinc concentration: 0.6 mg/L.
Oil and grease: 4 mg/L.
BOD5 load is 40 mg/L × 24,000,000 L = 960,000,000 mg = 960 kg = 0.96 tonne.
Copper load is 0.3 mg/L × 24,000,000 L = 7.2 kg.
Zinc load is 0.6 mg/L × 24,000,000 L = 14.4 kg.
Oil and grease load is 4 mg/L × 24,000,000 L = 96 kg.
For ordinary inland waters, the Seventh Schedule uses RM10 per tonne of BOD load, RM50 per kg for the specified toxic contaminants category, and RM10 per kg for the other contaminants category.
So the effluent-related amount is approximately:
BOD5: RM9.60.
Copper: RM360.\
Zinc: RM144.
Oil and grease: RM960.
Total effluent-related amount: RM1,473.60.
Add basic licence fee: RM100.
Estimated total: RM1,573.60.
If the same discharge were into a Standard A catchment, the pollution-loading fee would be much higher because the Schedule uses RM100 per tonne of BOD load, RM500 per kg for the toxic-contaminant category, and RM100 per kg for the other-contaminant category.
Practical Compliance Programme
A regulated occupier should use the 1979 Regulations in this sequence.
First, identify the receiving environment. Decide whether the discharge enters a Standard A catchment or other inland waters.
Second, determine whether the premises are excluded by the First Schedule or governed by another prescribed-premises regime. Even if excluded, do not discharge regulation 6 prohibited substances.
Third, locate and document the legal point of discharge. It should match the point determined by the Director General.
Fourth, test effluent using recognized methods. Keep chain-of-custody, sampling time, flow conditions, weather, preservation method, analyst identity, and laboratory method.
Fifth, compare every parameter against Standard A or B. For metals and phenol/free chlorine, apply the special combination rules.
Sixth, do not dilute unless written authorization exists.
Seventh, obtain prior written permission before creating a new discharge source, changing a process, altering a discharge point, discharging onto land, or disposing sludge.
Eighth, report material application changes within seven days.
Ninth, prepare an immediate spill-response protocol.
Tenth, install inspection chambers, sampling points, flow meters, and recording equipment.
Sample Monthly Effluent Monitoring Record
Premises: ABC Manufacturing Sdn Bhd.
Licence number: EQ/SIE/001/2026.
Discharge point: DP-1, final outlet chamber after treatment plant.
Receiving water: Drain leading to Sungai X.
Standard applicable: Standard B.
Sampling date and time: 15 May 2026, 10:30 a.m.
Weather: Dry.
Sample type: Grab
sample.
Flow on sampling day: 78 m³/day.
Laboratory method: Standard Methods for the Examination of Water and Wastewater.
Results: pH 6.8, BOD5 42 mg/L, COD 95 mg/L, suspended solids 80 mg/L, copper 0.4 mg/L, zinc 0.8 mg/L, oil and grease 7 mg/L.
Compliance finding: All listed results comply with Standard B, assuming no additional Director General limits apply.
Corrective action: Continue weekly monitoring; inspect clarifier sludge blanket; calibrate pH probe; maintain flow meter.
Certified by: Environmental Officer / Competent Person.
Sample Notice of Intended Change under Regulation 13
Subject: Request for prior written approval for process change affecting effluent quality.
ABC Manufacturing Sdn Bhd proposes to install a new rinsing stage and replace one cleaning chemical in Production Line 2. The proposed change is likely to increase daily effluent from 80 m³/day to 95 m³/day and may increase COD from approximately 80 mg/L to 120 mg/L before treatment. The treatment plant will be upgraded with an additional equalization tank and chemical dosing unit. No discharge from the modified process will occur until written approval is obtained.
Sample Inspection Checklist
A Director General’s officer or internal auditor should check the following:
The licence is displayed in the principal building.
The discharge point matches the approved point.
The outlet has not been altered without approval.
Flow meters are installed and functioning.
Sampling chambers are accessible and safe.
Effluent is not diluted after production.
Monitoring records match laboratory reports.
The laboratory method is recognized.
No sludge is disposed onto land without written permission.
No prohibited regulation 6 materials are discharged.
Spill-response equipment is available.
Workers know who to notify in an accidental discharge.
The occupier can produce records during inspection.
Sample Legal Charge Theory
A prosecution theory might be framed this way:
The accused, being the occupier of industrial premises at Lot 10, Industrial Area X, discharged effluent into inland waters at Discharge Point 1. The effluent was found, by analysis conducted according to recognized methods, to contain COD of 140 mg/L and suspended solids of 160 mg/L. The receiving waters were not within Standard A catchment areas, so Standard B applied. The results exceeded Standard B limits. The accused had no valid licence authorizing contravention of the acceptable conditions. The conduct therefore amounted to unlawful discharge in contravention of the regulatory limits read with section 25 of the Environmental Quality Act 1974.
A defence lawyer would normally examine whether the sample came from the legally determined discharge point, whether the method of analysis complied with the required method, whether the receiving water was correctly classified as Standard A or B, whether a licence or written permission existed, whether the premises fell within an exclusion, and whether the alleged effluent was in fact from the accused’s premises. That is legitimate legal analysis, not a licence to evade environmental duties.
Research Critique of the 1979 Regulations
The 1979 Regulations were strong for their time because they created national effluent standards, distinguished sensitive water-supply catchments, required prior permission for new sources, controlled land discharge, prohibited dilution, and required immediate reporting of spills. Those are still good regulatory ideas.
The weakness is that the system is heavily concentration-based. A concentration limit can be misleading if total volume is high. A discharge of 50 mg/L BOD at very high volume may impose more total pollution load than a smaller discharge at higher concentration. The Seventh Schedule partly recognizes this by using pollution-loading fees, but the main compliance limits still operate as concentrations.
The second weakness is that the list of parameters reflects the period in which the Regulations were made. Modern effluent governance often needs broader concern with emerging contaminants, persistent organic pollutants, nutrients, endocrine-disrupting compounds, surfactants, microplastics, and site-specific ecological sensitivity.
The third weakness is that licensing contraventions may become a pathway for prolonged non-compliance if not tightly controlled. Regulation 11 tries to prevent this by allowing refusal where the licence would worsen inland waters or pollute another environmental segment. The Director General’s discretion is therefore central.
The fourth weakness is that the 1979 spill rule requires immediate notification but does not specify a precise hour limit. Modern 2009 industrial-effluent regulation is more exact: it requires the owner or occupier to inform the Director General immediately and not more than six hours from the occurrence of a spill, accidental discharge, or leakage that may access soil, inland waters, or Malaysian waters.
Current Law Comparison: 1979 to 2009
The 2009 framework modernized the law by splitting sewage and industrial effluent into separate instruments.
For sewage, the 2009 Regulations apply to premises discharging sewage into soil, inland waters, or Malaysian waters, except housing or commercial development below a population equivalent of 150. They require prior notification, proper operation of sewage treatment systems, and supervision by a competent person.
The 2009 sewage rules also require monitoring at the owner’s or occupier’s expense, flow meters, sampling equipment, recording equipment, monthly reporting, and inspection availability. They expressly use grab samples and recognized methods.
For industrial effluent, the 2009 Regulations require notification before new discharge sources or material changes, professional engineering design and supervision for treatment systems, declarations of compliance, and as-built drawings.
The 2009 industrial rules also require monitoring of COD and scheduled parameters, flow meters, sampling and recording equipment, monthly records, proper operation, performance monitoring, and supervision by a competent person.
The 2009 industrial rules are especially stronger on operational control. They prohibit discharge through a by-pass, prohibit dilution of industrial or mixed effluent, require notification of spills within six hours, require containment and cleanup, allow cost recovery, require training records, and allow prohibition orders.
Final Evaluation
The 1979 Regulations are best understood as Malaysia’s early technical code for wastewater governance. They created a disciplined system around discharge classification, effluent standards, laboratory methods, licensing, land disposal, sludge control, anti-dilution, inspections, and cost recovery. Their strongest provisions are regulation 8 on Standard A and Standard B, regulation 16 on the point of discharge, regulation 17 on dilution, regulation 18 on accidental discharge, and the Seventh Schedule fee system.
From a law professor’s perspective, the Regulations show a transition from ordinary pollution prohibition to scientific environmental administration. The law does not merely say “do not pollute.” It asks: What is the discharge? Where is it discharged? What is the receiving water? What parameter is exceeded? Was the sample properly taken? Was the point of discharge approved? Was there a licence? Was there dilution? Was the sludge handled lawfully? Was the Director General notified?
That is why these Regulations remain valuable for research even after revocation. They explain the foundations of Malaysian effluent control and show how later 2009 instruments became more detailed, more operational, and more compliance-driven.